Frozen Over and Snowed Under

Frozen Over and Snowed Under (HM16FG)

Location: Breckenridge, CO 80424 Summit County
Buy Colorado State flags at Flagstore.com!
Country: United States of America
Buy United States of America flags at Flagstore.com!

N 39° 28.453', W 106° 2.448'

  • 0 likes
  • 0 check ins
  • 0 favorites
  • 465 views
Inscription
Alone Against the Elements

Intense cold, high winds, drifting snow, and avalanches challenged railroaders all winter long. The endless gales prompted a standard joke in Como. Newcomer: "Does the wind always blow this way?" Old-time: "No, sometimes it blows the other way."

To cope with the grueling winter days, the men "doubled up" on woolen underwear, shirts, pants, socks, overalls, and jackets. By the end of the day, the clothes would be frozen on their bodies. One old-timer remembered his grandfather coming home and standing by the stove to thaw out while his wife peeled off the frozen clothing.

Danger loomed constantly. Ice, snow, or rocks on the track could derail trains and cause deadly accidents. With little visibility, engineers plowed through the snow without stopping, using a "bucking" or "butterfly" plow like No. 9's to push through the drifts. When deep snow forced the engine to stop, the engineer uncoupled from the train, backed up, and charged the drift.

He then threw the engine in reverse and continued "bucking" until he rammed his way through. Bucking required skill. It was easy to stall in the drift if the engineer did not reverse quickly enough.

Throughout the harsh winter, crews worked under an unwritten rule: make it happen. Railroaders were "on their own" when problems arose; they could not communicate with the dispatcher. So they dug their own way through drifts, made their own repairs, and did whatever else was necessary to keep the line moving.

A last resort: the rotary snowplow

All winter long, railroaders battled avalanches and tall drifts on Boreas Pass and in Ten Mile Canyon, a segment known as the "High Line." In this ongoing struggle, the rotary snowplow was the railroaders' secret weapon. Rotary No. 1 resembles the rotaries used on the High Line. This plow actually served on a narrow gauge railroad in Alaska. Over the years, the High Line operators generally had one rotary to call on in extreme snow conditions.

The rotary could not move along the tracks by itself; its engine was dedicated to propelling the large rotating blades on the front of the vehicle. The blades worked like a modern snow blower, blasting snow up to 30 feet on either side of the track. It often took as many as six or seven smoke-belching locomotives to push the 108-ton rotary snowplow along.

A crew of four operated the rotary. The pilot sat in front, behind the blades, where he had a clear view of the track. Over the roar of the engine and blades, the pilot used whistle signals to communicate with the engines pushing the rotary. The rest of the crew consisted of an engineer and two firemen. The engineer and the pilot used bells and hand signals to communicate with each other over the machinery's deafening noise.

A shift on the rotary could easily last more than twelve hours. Blowing snow often iced shut the plow's doors, which had to be pried open from the outside. Sometimes the snow overwhelmed the rotary, bringing all progress to a halt. At that point, crews of "snow diggers" or "snow birds" attacked the towering drifts by hand, shoveling down to the height of the plow so the rotary could resume chewing through the snow. The snow diggers lived in box cars traveling wherever the rotary went.

Avalanches brought trees, boulders, and other debris onto the track, making the plowing harder. Sometimes, clearing the track required a blast of dynamite. Then the track needed to be repaired, adding extra time and expense. Railroaders liked to tell about the time the rotary encountered cattle killed in an avalanche. Legend has it when the rotary cut through the snow, it produced flying beef steaks.

The difficulty, danger, and length of winter operations took a financial toll on the railroad companies operating the High Line, no doubt contributing to the line's eventual closure in 1937.
Details
HM NumberHM16FG
Tags
Placed ByBreckenridge Heritage Alliance and the Summit Historical Alliance
Marker ConditionNo reports yet
Date Added Sunday, September 21st, 2014 at 11:01am PDT -07:00
Pictures
Sorry, but we don't have a picture of this historical marker yet. If you have a picture, please share it with us. It's simple to do. 1) Become a member. 2) Adopt this historical marker listing. 3) Upload the picture.
Locationbig map
UTM (WGS84 Datum)13S E 410479 N 4369920
Decimal Degrees39.47421667, -106.04080000
Degrees and Decimal MinutesN 39° 28.453', W 106° 2.448'
Degrees, Minutes and Seconds39° 28' 27.18" N, 106° 2' 26.88" W
Driving DirectionsGoogle Maps
Area Code(s)970, 303
Closest Postal AddressAt or near 1145 Co Rd 10, Breckenridge CO 80424, US
Alternative Maps Google Maps, MapQuest, Bing Maps, Yahoo Maps, MSR Maps, OpenCycleMap, MyTopo Maps, OpenStreetMap

Is this marker missing? Are the coordinates wrong? Do you have additional information that you would like to share with us? If so, check in.

Check Ins  check in   |    all

Have you seen this marker? If so, check in and tell us about it.

Comments 0 comments

Maintenance Issues
  1. Is this marker part of a series?
  2. What historical period does the marker represent?
  3. What historical place does the marker represent?
  4. What type of marker is it?
  5. What class is the marker?
  6. What style is the marker?
  7. Does the marker have a number?
  8. What year was the marker erected?
  9. This marker needs at least one picture.
  10. Can this marker be seen from the road?
  11. Is the marker in the median?